AERO-SHIELD
A two-layer steel net screen that stops strike drones at a distance from the asset it protects. It works around the clock by construction alone — no power, no sensors, no operators.
VisualisationWhat we build into every panel
Each panel hangs on its own edge rope. The outer layer of overlapping steel rings takes the energy of the impact and holds the drone away from the asset; the inner mesh catches fragments.
Absorbs impact energy and stops the drone at a distance from the asset.
Fine steel mesh from our own mesh line catches debris.
Every panel on its own rope: a damaged one is replaced alone.
Free-standing frames to EN 1090-2 EXC2; foundations by the site contractor.
Protects by construction, 24/7. The only maintenance is visual inspection.
Panels and rolls cut to the layout; loads and anchoring calculated per site.
To EN 10244-2 and EN 12385; corrosion tested to ISO 9227 neutral salt spray.
Each coil checked against its EN 10204 3.1 certificate; tensile test every batch.
BAAINBw programme; impact trials at WTD 52 planned for Q3 2028.
Built for the sites that keep a country running
Substations and transformers, fuel and gas tanks, power plants and CHP, ammunition and materiel depots, water and pumping stations, communications sites.




Three ways to install
The variant follows the site. We supply panels, ropes, fittings and anchors; the layout for a specific site is shared under NDA.
Panels, edge ropes, clamps and anchors mounted on existing structures — walls, masts, buildings.
Galvanised steel frames to EN 1090-2 EXC2; foundations are built by the site contractor.
Enclosures, net roofs on masts and sector screens, calculated for the object and its threat directions.
Built to be qualified
Values on this page are design values until qualification. Quality management to ISO 9001 and AQAP 2110, group certificate targeted for April 2028.
| Standard / test | Scope | Status |
|---|---|---|
| EN 10244-2 · EN 12385 | Zinc-coated steel wire and wire rope | Design basis |
| EN 10204 3.1 | Incoming control of every coil; tensile test per batch | Design basis |
| EAD 340059 (based) | Energy-absorption tests | Plan 2027 |
| ISO 9227 | Neutral salt-spray corrosion test | Plan 2027 |
| EN 1090-2 EXC2 | Frame production certificate | Plan Q1 2028 |
| AQAP 2110 | Quality management, first scope | Plan Apr 2028 |
| WTD 52 | Impact qualification, BAAINBw programme | Plan Q3 2028 |
From site type to offer
We start with a trial delivery or demonstration against success criteria agreed in advance.
Site type, the area or objects to protect, and any existing structures.
Panel layout, anchoring concept and a commercial offer.
Trial delivery or demonstration, then a frame contract with annual price review.
Tell us what you need to protect or build
We answer within two working days. Detailed specifications and investor materials are shared under NDA.
Saxony, Germany · Ústí region, Czech Republic